Jun
25
2008

Concrete Footers (almost) Complete


The concrete footers for our building addition are nearly complete. Three of the four sides are done. Tom will pour the fourth wall along with the floor slab.
The building is coming along, between other shop jobs. We have had great luck with the weather, as Laramie is the perfect place to be in the summertime.
The building package is here and ready to put up as soon as we can get the concrete complete. Insallation should arrive in a couple of weeks.

Written by Tom in: General |

No Comments »

RSS feed for comments on this post. TrackBack URL

Leave a comment

Powered by WordPress | Solar Dave